By the NP Environmental Team, Waterville, NY · Published September 16, 2024
Most homeowners only see the last day of a heat pump installation — the truck, the crew, the new unit on its stand. The work that decides whether that system performs for decades happens before and after that day. Here is the whole process as we run it in Central New York.
Step one: choose the right type of heat pump
There are two families, and both are right answers for different homes. Air-source heat pumps pull heat from the outdoor air with no excavation, and modern cold-climate models handle CNY winters at 200–300% seasonal efficiency. Ground-source (geothermal) heat pumps pull heat from the earth through buried loops at 300–500% seasonal efficiency, and the loops carry a 50+ year life.
The choice depends on the house, the yard, your current fuel, and your budget, and our engineers match the system to your home at the free assessment. We lay out both options honestly; how geothermal works is a good starting point if you are curious.
Step two: size the system properly
This is the step most often skipped, and the one that matters most. An undersized system cannot hold temperature on the coldest nights; an oversized one short cycles, wastes energy, and never dehumidifies properly in summer. We run a full Manual J heat-loss calculation at Central New York design temperatures, accounting for insulation, windows, orientation, and air leakage. Square footage alone is not a sizing method.
Step three: design and proposal
With the loads known, the system is modeled in Mitsubishi’s own design software: equipment selection, head or air-handler placement, line-set routing, and electrical requirements. We take the time on every proposal, not an hour, because the design is being engineered rather than guessed. Cheap is expensive when the sizing is wrong. This is also when we file the NYS Clean Heat and utility program paperwork on your behalf.
Step four: prepare the site
- Air-source: the outdoor unit needs clear airflow, a stand above the snow line, and protection from roof slide-off. Indoor locations are confirmed for line-set and condensate routing.
- Geothermal: the loop field is excavated or drilled, the loops are installed and pressure tested, and the trenches are closed before the indoor work begins. Our geothermal installation page walks through this in more detail.
Step five: set the outdoor and indoor units
The outdoor unit goes on its pad or stand and the indoor units — ductless heads, or an air handler tied into existing ducts — are mounted and leveled. For geothermal, the indoor heat pump connects to the loop field through a flow center. Certified NP partners do this work, to the NP design.
Step six: connect refrigerant lines and electrical
Refrigerant lines are brazed under a nitrogen purge to keep the inside of the copper clean. The circuit then gets a nitrogen pressure test to prove it is tight, followed by evacuation below 500 microns to pull out moisture and air before the refrigerant is released. Electrical connections are made, the disconnect is installed, and the controls are wired.
Step seven: commission and hand over
Commissioning is where the system is proven. We verify the refrigerant charge, measure airflow and temperature split, test heating and cooling modes, and confirm the thermostat and any zoning work as designed. The readings are written down and handed to you unasked, so you have a baseline for the life of the system. The installation is then covered by the NP Shield™ 10+2-year labor warranty.
Start with the numbers
Every good installation starts with a measurement, not a quote. Book a free home assessment and we will run the heat-loss calculation, walk you through both heat pump types, and put the design in writing. Call (315) 841-8730 with any questions.